Solar System Interconnection Forms

If you are ready to begin the process of installing a Solar System and connecting it to PRECO’s distribution lines, start with the forms below.

Each PDF form — containing fillable fields — may be downloaded, completed and printed.

Customer Checklist (PDF)

Interconnection Agreement (PDF)

Application for Operation of RGS (PDF)

Standards and Operation Certification (PDF)

Each form must be fully completed and signed. Permission to operate will be given upon approval of your application, installation of your system, and a new specialized meter installed.

If you need assistance with completing the forms, email PRECO’s Energy Services Department at EnergyServices@preco.coop.

Peace River Electric Cooperative reserves the right to correct, modify, alter or change the above forms or agreement conditions without prior notice.